Case Study: Gas-Dry Installation on 345 kV Critical Bus

Project Overview A major Midwestern utility deployed the EMT Gas-Dry unit on a mission-critical asset where outages are rare and no energised work – including SF₆ testing – is permitted. Gas-Dry was installed on a 345 kV transmission bus; the objective to evaluate in-field moisture reduction performance under real operating conditions. Ambient temperatures during […]